Posts

Part of Old Bakery Street to be resurfaced

\"\"

Road works in Triq L-Ifran il-Belt Valletta

Transport Malta will carry out maintenance work in part of Triq L-Ifran il-Belt Valletta starting tonight between 20:00hrs and 05:30hrs.  Works will carry on tomorrow between 23:00hrs and 05:30hrs.

During works, this part of the road will be closed to traffic.

Drivers are encouraged to seek alternative routes and follow instructions by the officials on site.

Asphalting in Mġarr

\"nightasphalt-2\"

Asphalting works in Triq Għajn Tuffieħa u Triq Sir Temi Żammit L-Imġarr

Transport Malta will asphalt Triq Għajn Tuffieħa u Triq Temi Żammit L-Imġarr between today and Friday 18th November between 20:00hrs and 05:00hrs.

During works, the road will be closed to traffic.

Drivers are advised to drive carefully, seek alternative routes and follow instructions by officials on site.

Resurfacing in Marsa

\"nightasphalt-2\"

Maintenance work in Triq Aldo Moro and Triq Diċembru 13

Transport Malta will carry out maintenance work in Triq Aldo Moro near Marsa roundabout, between today and Thursday 17th November between 20:00hrs and 06:00hrs.

During works, part of this road direction to Raħal Ġdid will be closed therefore traffic including public transport will be diverted onto the first slip way to Marsa.  Traffic towards Valletta will proceed on one lane.

Works will continue in Triq Diċembru 13 between Thursday 17th and Friday 18th, between 20:00hrs and 06:00hrs. Road will be partially closed in phases according to works.

Drivers are advised to drive carefully and to follow instructions by officials on site.

Maintenance work in Triq il-Marsa

\"nightasphalt-2\"

Maintenance work in Triq il-Marsa

Transport Malta will carry out maintenance work in Triq il-Marsa in Marsa between today and Friday 14th October 2016. Works will be carried out between 20:00hrs and 05:00hrs.

Road will remain open to traffic during the day but closed to traffic during works.

Drivers are advised to drive carefully, seek alternative routes and follow instructions by officials on site.

Works in Swieqi

Works in Swieqi, in the tunnels in Triq M A Vassalli and the area

Transport Malta will carry out resurfacing works in part of Triq il-Qasam and part of Triq San Andrija. To reduce  inconvenience to traffic, major works will be carried out  tonight  between 20:00hrs and 05:00hrs. Minor works will be completed tomorrow during the day.

Road will remain accessible but no parking will be allowed along the road. 


Transport Malta will carry out resurfacing works in the tunnels in Triq Mikiel Anton Vassalli in both directions. Works will be carried out this week, at night  between 20:00hrs and 05:00hrs.

During works, the tunnels will remain accessible with traffic being diverted onto one lane for each direction.  During the day, the tunnels will be fully accessible.

Drivers are encouraged to avoid the area as much as possible, to drive with caution and to follow instructions by the officials on site.

Works in Castille Square

Works at Castille Square by The Grand Harbour Regeneration Corporation

The Grand Harbour Regeneration Corporation will carry out asphalting works this evening, between 18:00hrs and 22:00hrs.

Upper part of Castille Square with Triq Pope Pius V, before the parking area of the Central Bank, will be closed to traffic during works.

Motorists are advised to remove their cars from the parking area before 18:00hrs.

More work on the Kappara Project

A visual update on the works that are being carried out on the Kappara Project.

New traffic arrangements in San Ġwann

Kappara: alternative routes

\"New

Following the completion of roadworks in Vjal ir-Rihan San Ġwann, Transport Malta will implement line markings and new signage between 19:00hrs today and 07:00hrs tomorrow morning.

As from Saturday 18th after 07:00hrs, traffic from Triq Tal-Balal will be diverted onto Triq Salvu Busuttil, onto Triq Caruana Dingli and onto Vjal ir-Rihan. Access to the service road at Vjal ir-Rihan will only be permitted from Triq Caruana Dingli. Parking along the service road will be re-organised according to the new traffic flow.

These traffic arrangements are part of the alternative routes during works on the Kappara Project.

Drivers are encouraged to visit news.transport.gov.mt.

Resurfacing of Kirkop Junction

Transport Malta will resurface Kirkop Junction.  Works will start tonight and continue the following night. On both nights, works will start at 20:30 and finish early in the morning to minimise traffic disruption.

The junction will remain accessible to vehicles but parts of the carriageways will be restricted at different times.  

Kindly avoid the area when possible. Follow the temporary signs and official’s instructions.

Resurfacing in Castille Square

The Grand Harbour Regeneration Corporation will resurface part of the upper part of Triq Pope Pius V.  

The upper part of Castille Square and Triq Pope Pius V, before the parking area of the Central Bank, will be closed to traffic from 18:00hrs to 23:00hrs.

Motorists are advised to remove their cars from the parking area before 18:00hrs.