Mrieħel Bridge on site

Two low riders and a truck carried the Mrieħel Pedestrian Bridge sections from Ħal Far to the site yesterday evening.  Tonight personnel will weld the structures together to form the bridge.  The bridge will then be put up and welded in place the following night.