TRAFFIC MANAGEMENT

  • North | South | North Lanes will be kept open as much as possible
  • Night works when possible
  • Closures in phases
  • Alternative routes remain throughout

K_16

K_17

There will be signs in main junctions all over Malta to remind drivers about the works. The signs will help drivers remember to take alternative routes.

Upgraded Roads

  • Triq L-Istefanotis and Triq Caruana Dingli, San Ġwann
  • Triq Reggie Miller, Gżira
  • Triq Briffa & Triq il-Plejju, San Ġwann
  • Triq il-Pellikan, San Ġwann / Swieqi
  • p/o Triq Birkirkara San Ġwann / San Ġiljan
  • p/o Vjal ir-Rihan, p/o Triq in-Naxxar, San Ġwann
  • p/o Triq Bellavista and I/ E San Gwann
  • Telgħet Birkirkara / Telghet San Ġiljan, San Ġiljan
  • p/o Triq il-Baltiku San Ġiljan / San Ġwann
  • Triq Testaferrata, Gżira
  • p/o Triq ta’ L-Ibraġġ, p/o Triq tal-Balal, p/o Triq MA Vassalli San Gwann / Ibraġġ / Msida
  • Triq L-Imsida, Gżira
  • Triq Ħal Għagħur & Triq Serracino Inglott Iklin